Pegasus 1.5KW installation in Copenhagen
new installation of Pegasus 1.5kw in Copenhgen, system is installed as a grid-tie system with HYGCI-15 inverter, soon video camera and remote monitoring system will be installed to check on the wind turbine performance from time to time. The highest wind speed of the day for installation is about 5m/s, we hear very little noise from turbine even the video was shot only 2 meter distance from rotor hub